01 · Feb 2022
Survey
We walk the plot before we draw a line: levels, the sun's path through the year, the prevailing wind, where the snow drifts, what the neighbours see. At Birkelia that was two visits in February, one at noon and one at dusk.
02 · Mar 2022
Sketch
Position and section come first, in soft pencil; the plan follows once the section works. Birkelia's floor was set at the crest's high point, so its one room looks down the slope.
03 · May 2022
Detail
Junctions at 1:5: the sill on its steel base plate, the plate on its pin, the pin grouted into the rock. All four footings are drawn, because each one stands on different ground.
04 · Aug–Nov 2022
Build
One of us is on site every week of the build, and the builder's calls are answered the same day. Birkelia went up the slope in panels carried by hand: a machine could not reach the crest without taking out birches.
01 · Feb 2022
Survey
We walk the plot before we draw a line: levels, the sun's path through the year, the prevailing wind, where the snow drifts, what the neighbours see. At Birkelia that was two visits in February, one at noon and one at dusk.
02 · Mar 2022
Sketch
Position and section come first, in soft pencil; the plan follows once the section works. Birkelia's floor was set at the crest's high point, so its one room looks down the slope.
03 · May 2022
Detail
Junctions at 1:5: the sill on its steel base plate, the plate on its pin, the pin grouted into the rock. All four footings are drawn, because each one stands on different ground.
04 · Aug–Nov 2022
Build
One of us is on site every week of the build, and the builder's calls are answered the same day. Birkelia went up the slope in panels carried by hand: a machine could not reach the crest without taking out birches.